Saltar navegación principal
Normas BSI – AENOR
BS EN 61400-25-1:2017 - TC

BS EN 61400-25-1:2017 - TC

Tracked Changes. Wind energy generation systems. Communications for monitoring and control of wind power plants. Overall description of principles and models

Fecha:
2020-02-27 /Under Review
Comité:
PEL/88
Resumen:
IEC 61400-25-1:2017 is also available as IEC 61400-25-1:2017 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.

IEC 61400-25-1:2017 gives an overall description of the principles and models used in the IEC 61400­25 series, which is designed for a communication environment supported by a client-server model. Three areas are defined, that are modelled separately to ensure the scalability of implementations: wind power plant information models, information exchange model, and mapping of these two models to a standard communication profile. This new edition includes the following significant technical changes with respect to the previous edition: general harmonization of text and overview models with the other parts of the IEC 61400­25 series, harmonization of definitions in other related standards.
Keywords:
Data transmission, Electric generators, Turbines, Wind turbines, Wind power, Communication networks, Data transfer, Control systems, Power measurement (electric), Information exchange, Wind-electric power stations
355,55
Idioma Formato

Formato digital

Nota: Precios sin IVA ni gastos de envío

Añadir a la cesta