Saltar navegación principal
Normas BSI – AENOR
BS 376-1:1951

BS 376-1:1951

Railway signalling symbols. Schematic symbols

Fecha Anulación:
2012-07-31 /Withdrawn
Comité:
GEL/9
Relación con otras normas BSI:

Reemplazada por: BS 376-1:2012

Keywords:
Signal devices, Colour-light signals (railways), Railway control systems, Railway signals, Point work, Route indicators, Railway equipment, Technical drawing, Graphic symbols, Railway track, Railway fixed equipment, Engineering drawings, Plans, Semaphore signals (railways), Schematic representation, Graphic representation, Symbols
235,38
Idioma Formato

Formato digital

Nota: Precios sin IVA ni gastos de envío

Añadir a la cesta