Overtesting should be done when (a) testing by variables is impractical because of time and cost considerations or because the probability distribution of stress to failure cannot be estimated with sufficient accuracy, and (b) an unrealistically large number of parts would have to be tested at the specification stress for the necessary confidence and survival probability.