ASTM E1946-07

ASTM E1946-07

Standard Practice for Measuring Cost Risk of Buildings and Building Systems

Fecha:
2012-05-02 /Historical
Superseeded by:
Scope:

1.1 This practice covers a procedure for measuring cost risk for buildings and building systems, using the Monte Carlo simulation technique as described in Guide E 1369.

1.2 A computer program is required for the Monte Carlo simulation. This can be one of the commercially available software programs for cost risk analysis, or one constructed by the user.

Keywords:
cost model; cost risk analysis; Monte Carlo simulation; sensivity analysis